Borexino Phase-II plotted component inventory and closure check

ID: solar.detector.borexino_phaseII_fig7_visible_component_closure

Pinned Fig. 7 vector paths separate the displayed solar and background curves in both TFC panels, with clipped or unplotted bins kept blank and their visible sum checked against the black total-fit line.

Status: diagnostic

Uncertainty

Sources

Claim boundaries

Diagnostic context only. Cite independent evidence for claims about the world.